How to make an AI mind map from meeting notes
Use one source to work through generation, review, editing, and Markdown export. Finish with a meeting outline you can keep working on.
Text generation, node renaming, and Markdown export work on Free. Signup grants 10 credits and each daily login adds 1. Free accounts can generate at most 3 maps a day, with sufficient credits required for each run. See plan limits
1. Prepare the meeting notes
Download the full English source below: fictional meeting notes with metrics, decisions, owners, and deadlines.
The people and business details are fictional. The map is real archived output generated on September 27, 2026 with the Fast model, Gemini 2.5 Flash Lite. This page reuses the archive; a new run may group the notes differently.
Download the full source (TXT)
Read and copy the source
Weekly Product Sync: Q4 Planning Date: Monday, September 22 Attendees: Maya (Product), Daniel (Engineering), Priya (Design), Tom (Growth), Lena (Customer Support) Note: this is a fictional team and fictional meeting, written as a sample input. 1. Review of Q3 results Maya opened by reviewing the Q3 numbers. Weekly active users grew 18 percent quarter over quarter, slightly below the 22 percent target. Activation, defined as a new user completing their first project within 24 hours, improved from 31 percent to 38 percent after the onboarding checklist shipped in August. Paid conversion stayed flat at 4.1 percent. Tom pointed out that most of the growth came from organic search, while the paid campaign in July cost more per signup than planned and was paused in mid-August. Lena shared the support summary: ticket volume dropped 12 percent, mostly because the new help center answers the top ten questions. The largest remaining category is sync conflicts between the desktop and mobile apps, which accounted for about a quarter of all tickets. Response time is now under four hours on weekdays, but weekend coverage is still a gap. 2. Q4 priorities The team agreed on three priorities for Q4. First, reliability of sync. Daniel proposed replacing the current last-write-wins approach with field-level merging, so that edits made offline on two devices no longer overwrite each other. He estimates six weeks of work for two engineers, including a migration for existing data. Priya asked for a clear conflict indicator in the interface for the rare cases that cannot be merged automatically. Second, team workspaces. Several of the largest customers asked for shared folders and role-based permissions. Maya wants a limited beta by the end of November with three roles: owner, editor and viewer. Billing per seat is out of scope for the beta and will be decided in January. Third, pricing page and upgrade flow. Tom showed that 60 percent of visitors who open the pricing page leave without clicking any plan. The hypothesis is that the comparison table is too long. Priya will prepare two alternative designs, and Tom will run an A/B test for three weeks once traffic allows a meaningful result. 3. Risks and dependencies Daniel flagged that the sync rewrite and team workspaces both touch the same data model, so they cannot be built fully in parallel. The proposal is to finish the data model changes first, in the first three weeks of October, and then split the work. Lena raised the risk that the migration could create a spike in support tickets; she asked for a one-week notice before release so the help center can be updated. There is also a hiring dependency: the second backend engineer position is still open. If it is not filled by mid-October, the team workspaces beta will slip to December. 4. Decisions - Sync rewrite is the top priority; team workspaces start after the shared data model work is done. - The workspaces beta will be invite-only, limited to about 20 customer teams. - No new paid campaigns in Q4; the marketing budget moves to content and search. - Weekend support will be covered by a rotating on-call schedule starting in October. 5. Action items - Daniel: write the technical design for field-level merging and share it by October 1. - Priya: two pricing page variants and the conflict indicator mockups by September 30. - Tom: set up the A/B test and define the success metric, which is plan clicks per pricing page visit. - Lena: draft the weekend on-call schedule and update the help center article on sync conflicts. - Maya: shortlist the 20 beta customer teams and send invitations by October 15. Next sync is on Monday, September 29.
2. Paste the source and generate
Sign in to MindLM, open text input, paste the full notes, choose the output language and model, check the credit quote, and generate.
Use text input for this source rather than document upload. Choose English to compare with the English archive, or Chinese for the translated example. Processing time varies with the source and service conditions.
3. Check against the source
Check action items, deadlines, numbers, and conditions. Pay particular attention to targets versus actual results.
Loading the interactive mind map…- Actual weekly active user growth is 18%; the target is 22%. The target must not become a reported result.
- Daniel must share the field-level merging design by October 1. That is not the deadline for completing the entire sync rewrite.
- The workspace beta targets late November, but slips to December if the second backend engineer is not hired by mid-October. Keep that condition.
Inspect the archived Markdown outline
# Product Performance and Q4 Priorities
## Q3 Performance Review
- **Weekly Active Users (WAU)**:
- Grew 18% quarter over quarter.
- Below the target of 22% growth.
- **Activation**:
- Improved from 31% to 38%.
- Improvement followed the shipment of the onboarding checklist in August.
- **Paid Conversion**:
- Remained flat at 4.1%.
- **Growth Drivers**:
- Most growth originated from organic search.
- Paid campaign in July exceeded planned cost per signup and was paused mid-August.
- **Support Metrics**:
- Ticket volume dropped 12%.
- Reduction attributed to the new help center addressing top ten questions.
- Sync conflicts between desktop and mobile apps remain the largest ticket category, accounting for approximately 25% of all tickets.
- Response time is under four hours on weekdays.
- Weekend coverage remains a gap.
## Q4 Priorities
- **Reliability of Sync**:
- Proposal: Replace the current last-write-wins approach with field-level merging.
- Estimated effort: Six weeks of work for two engineers, including data migration.
- User interface: Need for a clear conflict indicator for cases that cannot be merged automatically.
- **Team Workspaces**:
- Customer demand: Several large customers requested shared folders and role-based permissions.
- Beta target: Limited beta by the end of November.
- Roles in beta: Owner, editor, and viewer.
- Out of scope for beta: Billing per seat (decision in January).
- **Pricing Page and Upgrade Flow**:
- User behavior: 60% of visitors who open the pricing page leave without clicking any plan.
- Action: Two alternative designs will be prepared and an A/B test will be run for three weeks.
## Risks and Dependencies
- **Data Model Conflicts**:
- Sync rewrite and team workspaces share the same data model.
- Cannot be built fully in parallel.
- Proposed approach: Finish data model changes first (first three weeks of October), then split work.
- **Migration Risk**:
- Potential spike in support tickets during migration.
- Mitigation: One-week notice before release for help center updates.
- **Hiring Dependency**:
- Second backend engineer position is still open.
- Impact: If not filled by mid-October, team workspaces beta will slip to December.
## Decisions
- **Priority Order**:
- Sync rewrite is the top priority.
- Team workspaces development to commence after shared data model work is completed.
- **Workspaces Beta**:
- Invite-only.
- Limited to approximately 20 customer teams.
- **Q4 Marketing**:
- No new paid campaigns.
- Marketing budget reallocated to content and search.
- **Weekend Support**:
- Covered by a rotating on-call schedule starting in October.
## Action Items
- **Daniel**:
- Write technical design for field-level merging.
- Share by October 1.
- **Priya**:
- Develop two pricing page variants.
- Create conflict indicator mockups.
- Deliver by September 30.
- **Tom**:
- Set up A/B test for pricing page.
- Define success metric: plan clicks per pricing page visit.
- **Lena**:
- Draft the weekend on-call schedule.
- Update help center article on sync conflicts.
- **Maya**:
- Shortlist 20 beta customer teams.
- Send invitations by October 15.
## Next Meeting
- **Date**: Monday, September 29.4. Rename a node
Rename Daniel to include his task and deadline. Free supports editing node text; adding or deleting nodes needs Pro or Max.
Original node: Daniel
Suggested rename: Daniel — field-level merging design, due Oct 1
This is a suggested manual edit, not part of the archive above. On Free, add further notes in the exported Markdown file.
5. Save and export Markdown
Wait for saving to finish, then export Markdown from the top of the editor. Put the .md file in an Obsidian vault folder and add the source.
Markdown export reads saved content. Open the file in Obsidian to get headings and lists. It does not automatically become a visual mind map or sync changes back to MindLM.